Guideline P.1 Design and Construction Process
Intent
To support the compliance and outcome tracking process by facilitating the creation and communication of relevant project goals and information.
Required Performance Criteria
- Develop an Owner’s Project Requirements (OPR) document, beginning at the predesign or equivalent phase. This document is developed in coordination between the owner, commissioning authority, architect, engineer and any other relevant stakeholders. A commissioning authority must be established at the predesign phase to complete the early-phase goal setting. The OPR includes:
- A list of the authors who developed the document and assisted in early team kickoff and goal setting meeting(s).
- All sections listed in Section 6, Appendix D of ASHRAE 202-2013.
- A preliminary SB 2030 Energy Standard, as created through the SB 2030 Energy Standard Tool.
- Regular updates and developments as the owner’s requirements change and project details become available.
- The requirement that trend data is able to be saved for major equipment for a minimum of two months if a building automation system is requested in the OPR.
- Develop a Commissioning Plan (Cx Plan) from the OPR with the assistance of the architect, engineer, commissioning authority and owner. The Cx Plan should follow section 7 and Appendix E in ASHRAE 202-2013.
- Develop a Basis of Design document (BoD) from the OPR with the assistance of the architect, engineer, commissioning authority, and owner. The BoD should follow section 8 and Appendix F of ASHRAE 202-2013.
- Develop a safety risk assessment of indoor air quality issues for projects that are attached to occupied buildings (“new building” additions or “major renovations” only).
- Develop indoor air quality procedures according to a Construction Air Quality Management Plan and Warranty Period Air Quality Management Plan. The Construction Air Quality Management Plan and the Warranty Period Air Quality Management Plan must have at a minimum the sections outlined in Templates P1E-1 and P1E-2.
Recommended Performance Criteria
- Assemble an appropriate stakeholder team that includes representation from every discipline involved in the project, including: the owner’s decision-making team, users, occupants, operations and maintenance representatives, at least one representative from the community, and at least one agency “client” or visitor representative. An owner representative and commissioning agent must also be included, if applicable. Members must make a commitment through post-occupancy.
- Facilitate planning/review workshops at key phases with all team members.
- In Predesign:
- Comprehensive planning workshop
- Programming workshop
- In Design:
- Conduct facility performance workshop within the first 2–3 weeks of the design phase.
- Convene a multidisciplinary team at least once per design phase for integrated progress review toward guidelines.
- Convene a stakeholder team for regularly integrated progress reviews. Stakeholder team to meet a minimum of once per phase.
- Convene general contractor and subcontractors for preconstruction kickoff meeting to review the B3 Guidelines goals and objectives.
- Discuss progress toward project outcomes during construction meetings.
- After occupancy:
- Convene facility operations manager, human resources manager, and others who offer cross-disciplinary points of view on facility operations for annual meetings to review operation practices, complaints, and building maintenance issues.
- In Predesign: