Site and Water Guidelines
« Previous Guideline | Next Guideline »
S.8 Building Water Efficiency
Intent
Minimize municipal potable water or harvested groundwater (well water) use in buildings to conserve water resources and minimize water and wastewater treatment infrastructure impacts and cost.
Required Performance Criteria
- Reduce municipal potable water or harvested groundwater use in
building by 30% compared to code (1992 Energy Policy Act
requirements) for any fixture types referenced by those
requirements. The criteria may be met by any combination of:
selection of low or no flow fixtures, use of alternatively sourced
water, or other strategies. Major Renovation Path projects, may
limit performance criteria application to the number of fixtures
included in the renovation scope, however, even if no fixture
replacement was planned in renovations scope, for any plumbing
fixtures within the renovated area: faucets in the renovated area
shall be upgraded with low-flow faucet aerators, and showerheads
shall be upgraded with low-flow showerheads. In order to verify compliance with this guideline during operation of the building it is necessary to sub-meter indoor water consumption separately from irrigation.
Recommended Performance Criteria
- Reduce municipal potable water or harvested groundwater use in building by 50% compared to code (1992 Energy Policy Act requirements) for any fixture types referenced by those requirements. The criteria may be met by any combination of: selection of low or no flow fixtures, use of alternatively sourced water, or other strategies. Major Renovation Path projects, may limit performance criteria application to the number of fixtures included in the renovation scope.
Compliance Tools and Resources
- Use Worksheet S-8 Building Water Calculator to calculate building water use for base and design. This also shows EPA required flow and flush fixture rates, and example fixture performance values.
Related B3 Guidelines Documents
« Previous Guideline | Next Guideline »