Guidelines Home     |     v3.2r02     |     v3.1     |     v3.0     |     v2.2     |     Training     |     Documents     |     Previous Versions

Version 3.1 Download Documents

All Guidelines (version 3.1)

B3 Guidelines Tracking Tool (link)

Appendices:

Appendix P-0c: B3 Guidelines Applicability Form

Appendix P-1b1: Design and Construction Commissioning Process

Appendix P-1b2: Commissioning Roles

Appendix P-1e1: Design and Construction Phase Air Quality Management Plan Template

Appendix P-1e2:  Corrective Period Air Quality Management Plan Template

Appendix S-2c: Outdoor Water Calculator

Appendix S-2d: Building Water Calculator

Appendix S-4: Albedo Calculator

Appendix S-5a: Bird Safe Calculator

Appendix S-5f: Bird Safe Monitoring Worksheets

Appendix S-5m: Bird Safe Building Narrative Template

Appendix E-2a: User Guide – Levelized Cost of Energy Calculator, Predesign Phase

Appendix E-2b: Levelized Cost of Energy Calculator, Predesign Phase

Appendix E-2c: Levelized Cost of Energy Calculator, Design Phase

Appendix I-2: Glaser Calculator

Appendix I-3: Qualitative Moisture Assessment Worksheet

Appendix I-4: Enclosure Thermal Comfort Worksheet

Appendix I-5: Lighting Attributes Worksheet

Appendix M-1a: Material Selection Calculator

Appendix M-2: Environmentally Preferable Materials

Appendix M-3b1: Example Specification Language for Construction Waste Management

Appendix M-3b2: Construction Waste Recycling Economics Calculator

Appendix M-3b3: Packaging Waste Recycling Economics Calculator

B3 Guidelines Supporting Documents:

Guidance for Projects Using Asset Preservation Funding (PDF)

Guidance for Variances (PDF)

Transition to Operations (PDF)